Start and survey
Clear the storage medium, the required volume, the on-site conditions, the connection points and the operational requirements.
Industrial tank systems
Industrial tank construction with site construction and pipework systems connections.
Tank construction disciplines
We fabricate buffer tanks and custom industrial vessels for heating, cooling, thermal-water and process systems. Shells, stiffeners, nozzles, on-site assembly and connections are specified according to the application and site conditions.
For thermal water, process water, heating and cooling systems.
Survey, foundations, structural preparation and assembly on site.
Fabrication of shells, stiffeners, rings and connected steel elements.
Connections, access points and final checks for integration into the system.
Buffer tanks and industrial containers
Industrial containers are prepared for thermal water, for technological water, heating or cooling systems and for storage of other agreed operating media. The tank may be responsible for buffering, heat storage, provision of operational reserves or for helping the system to operate more evenly.
The size of the tank is adjusted to the task, storage medium, on-site capabilities and the connecting system. In all cases, feasibility is subject to technical coordination; the aim is to establish a usable, adaptable and sustainable system.
Our finished tanks
Construction procedure

Clear the storage medium, the required volume, the on-site conditions, the connection points and the operational requirements.

We prepare the necessary structural elements, protective parts and access accessories.

In the receiving area, load, plane accuracy, drainage and subsequent access are also expected, because this is the basis of the entire tank system.

The base plate gives the starting plane. The diameter, connection and further construction sequence of the tank are recorded here.

The main tank elements, the stiffeners and the upper ring are assembled to create a stable, operable structure.

After welding of the cover, nodes and related structural parts, a durable and operational-proof structure shall be provided.

The internal details, access points and related elements are important for future usability and maintenance.

After pipework systems connections, service joints and final checks, the container may be transferred as part of the system.