Use behind zone name

A larger greenhouse may not be treated in all parts as the same use space. Different plants, growing conditions or arrangements can give different climate conditions. The development of zones should therefore not be derived from the size of the area alone. The first question is that which we want to observe or manage a real difference and how it relates to the production goal of the own plant.

For the investor, the zone plan can be understood if, in addition to all areas, the reason for the design can be stated. Different cultures, different use periods or a local condition to be investigated may be such a reason. Specific delimitation and technical solutions are a technical task. The purpose of the decision-making agreement is to ensure that the zone is not included for itself in the machine list, but that it is given a specific measurement or operation task.

Separate measurement is not automatically a separate intervention

Several measuring points can give a more detailed picture of the internal state, but not all areas can be regulated independently. The relationship between the measurement and the intervention system shall be examined separately. The offer must be made to determine which data is shown by control and what actual operating element can respond to it. Several of these values are not evidence of several independent climate regions.

The investor may follow the path of the measurement area and the associated system on the drawing. Where is the sensor and which state of operation is it representing? What's the connection to the adjacent parts? The detailed evaluation is carried out by a specialist, but the operating description helps to understand the concept chosen. The autonomy of the zones can therefore be reconciled on the basis of data and design of the system in question, not on the basis of the name.

Common systems shall also be identified

There may be a common energy, water or control connection with separate zones. Their suitability shall be assessed for the full operational requirement. In your own concept, let us see what is divided and what works together. This overview is also important for future enlargement or plant conversion decisions. The physical separation of the area and the autonomy of the technological relationship are not always the same issue.

Think of a plant where one part follows another production calendar. The operational condition of common equipment may also affect this. The project team must examine the different uses in the whole system. The location description for the investor for his own purposes helps: which zone is operational, what condition it requires and which common link to compare variants must be clarified separately before the planning decision.

The operator needs a transparent order

The name, measuring point and configuration manager of the zones shall be consistent with the documentation provided. The local team needs to know which area it belongs to. A misidentified signal may later make the assessment difficult. The system's usability is therefore not only a separate regulatory option, but also a way in which the operator follows the operation of the areas and indicates the unusual state.

If the cultivation arrangements are amended, the earlier interpretation of the zones should also be reviewed. The preservation of the relationship between the measurement target and actual use is more important than the unchanged name. The well-understood zone concept thus makes it possible to follow the differences in the own plant. The investor can decide on the condition of measurement, intervention and a common system, and does not consider the number of zones as evidence of the technical development of the greenhouse itself.

Questions to reconcile the project

  • What difference of use justifies the zone?
  • What is the actual action associated with a separate measurement?
  • Which system remains common between areas?

Professional background

The related international system solutions are provided by these primary manufacturers and execution sites. The decision aspects of the project shall be interpreted independently by the article; the specific size and content of the undertaking shall be clarified on the basis of the investment data.

Alabama Szer Kft.

development project preparation

The structure, engineering and on-site installation of the greenhouse is a coordinated working process. Learn the service area and compare the tasks of the planned investment.