M CO2 Part of the total climate action

In the Greenhouse technological offer, the CO2 the measurement or handling of the vehicle may occur under several other systems. In the own project, the first thing to do is to describe the cultivation strategy and the technical objective. The name of the device does not describe the use in itself. The operation shall be coordinated by the relevant cultivation and technical experts, based on the specific system and local conditions, with known responsibility.

Manufacturers' concepts can demonstrate different solutions which cannot be replaced by a single general CO2As a package. The investor should be able to know the function, data link and commitment content of the system. The choice cannot be justified merely by the result of another project. The local application and the associated operational condition may require a separate test and therefore the general information cannot provide all greenhouse setting or operating recipes.

Air exchange related to the same airspace

The air exchange and the greenhouse followed CO2state to be interpreted in relation to each other. The air path and the location of the measurement must be seen in its own climate action. If there is a change in ventilation use, the previous system assessment may give rise to a new question. Therefore, the investor should not treat the tasks as two separate machine orders, but should ask for an explanation of the joint operation in the respective plans and documentation.

In different operating situations, different climate challenges can be envisaged. The specific strategy is defined by the appropriate professionals, not by a measured value. It is useful to identify the production period, the crop and the climate situation under consideration for this consultation. Thus, system alternatives can be compared to the same task and the common application condition remains clear to the customer and operators.

The relationship between measurement and intervention should be known

The data shown by the sensor shall be linked to its specific location and system function. The presence of the sensor alone does not prove complete control or operational conformity. The offer and transfer shall show which data is decided, which intervention element is included and who shall check the operational relationship. The assessment of actual suitability is the responsibility of the professional planning and testing related to the own system.

In the operating order, the handling of the unusual signal and the data that appear to be incorrect shall be indicated. For the local team, be familiar with who you are signaling and where you can find the necessary system information. The technological and working conditions must be organised together by the responsible professionals. The general article does not replace this, but shows the important roles and data links of discussion, without a numerical target or an intervention order.

Our own application conditions are documented

In addition to the selected system, we retain the purpose of cultivation, the climate action under consideration and the responsibility of connecting tasks. The documentation of the specific equipment and the adjustment system adopted shall belong to the own plant. If the ventilation, production programme or other associated system changes later, the previous decision shall be reassessed. The change should not become a site solution isolated from another branch.

M CO2 The understanding of the connection between ventilation and ventilation therefore serves to ensure transparency of the whole system. The target related to the plant, the air path, the measurement and the operator's responsibility together provide a meaningful concept. The investor can ask specific questions about these. Instead of purchasing a device, you will be given a documented operating condition agreed for your own greenhouse, with appropriate professional actors and a transfer task related to the actual content of the undertaking.

Questions to reconcile the project

  • What strategy is the system linked to?
  • How does the interpretation change with different air exchanges?
  • Who is responsible for the technical consultation of measurement and intervention?

Professional background

The related international system solutions are provided by these primary manufacturers and execution sites. The decision aspects of the project shall be interpreted independently by the article; the specific size and content of the undertaking shall be clarified on the basis of the investment data.

Alabama Szer Kft.

development project preparation

The structure, engineering and on-site installation of the greenhouse is a coordinated working process. Learn the service area and compare the tasks of the planned investment.