Short cycle also means repeated movement

Greenhouse designed for salad or other leaf vegetables is an important design data for the chosen production cycle. If the programme includes frequent installation and harvesting, the role of internal handling and service requires greater attention. The customer presents the cultivation method and the operational timetable to the designers together. M Dalsem plant-dependent systems and Hoogendoorn your working data links provide a professional background for this. The specific arrangement does not follow merely from the low size of the plant. The path of the growing elements, workers and new materials determines whether the chosen space is actually well-used.

The cultivation method gives the equipment the task

The name of the leaf vegetables may include a different production element and water system. The investor should therefore specify the technology chosen and its operational requirements. Water dosage, return route and monitoring can be considered. If a movable growing element is included in the programme, the operational and access situation shall be included in the plan. The service space is not simply the remaining corridor. The customer requests that the designers show the route from the installation to the exception. Instead of a separate technical equipment list, this process shows the meaning of common design.

Harvest and incoming material meeting

Due to the frequent change of operation, the movement of the product and the new growing material may occur at the same time. The plan is worth drawing individual routes. This shows where congestion can occur, where there is a need for temporary space and which gate the service uses. The operational programme shall include the needs of the team and the assets. The producer's own operating order provides the specific data. The customer may thus examine, before the investment, whether, in addition to the intended growing surface, the system can be properly used for the daily product and material flows, not only as seen on the empty floor.

Zones and events should adjust to cycle

If stocks start at different speeds are placed in the house, the names of measurement and regulation shall be added. The physical zone, display and production log shall identify the same stock. The time of the change of cycle will help to evaluate later data. A space of the same name may contain other crops and therefore the history should not be revised. The customer clarifies how to follow installation, factory modification and harvest. The system therefore supports its own work process. Several data collected are not in itself an advantage if the corresponding status and period cannot be recovered.

At the time of delivery, we'll look at a full operational route.

In addition to the production elements, the service path shall be shown for testing the availability of finished greenhouse. The customer and the technology manager can check the layout connection by going through a typical session. The operational test of the equipment and the subsequent evaluation of the production result shall remain a separate task. The transfer documentation shall show the version achieved and the marking required for the operator. The advantage of the space designed for the short cycle can therefore be assessed from a specific user perspective. Not only the number of plants that can be planted, but also the handling of repeated work will be put in the foreground of the decision.

Questions to reconcile the project

  • How often and on what route is installation and harvesting done?
  • Where does moving new material, product and empty growing element meet?
  • How can the history of the zone be followed in successive production cycles?

Professional background

The related international system solutions are provided by these primary manufacturers and execution sites. The decision aspects of the project shall be interpreted independently by the article; the specific size and content of the undertaking shall be clarified on the basis of the investment data.

Alabama Szer Kft.

development project preparation

The structure, engineering and on-site installation of the greenhouse is a coordinated working process. Learn the service area and compare the tasks of the planned investment.