Define separation from real movement
The development of the greenhouse hygiene route starts from the movement of incoming material, worker, product, waste and return equipment. These should be drawn separately to make the meeting points visible. M FAO the production guide and Hoogendoorn The system following the working procedures provides a professional background for the system understanding of operation. The specific isolation and treatment arrangements shall be determined by the expert for the selected plant and technology. The investor shall not assume that a single common corridor is suitable for all uses. The decision shall be reviewed by the own establishment's stock, assets and daily operations.
Use of incoming material
The arrival of the new growing material and equipment is a separate operating situation. The customer will show you where to take over, where to check and what route to the production area. The task of the chosen technology may also be linked to this point. The temporary accommodation shall not remain randomly in the product-moving path. In addition to normal arrival, designers should be able to demonstrate the state of a larger shipment. The site gate and internal service form a common link. The manageable order will be to coordinate the relationship between the new material and the working stock according to their own programme.
Road of waste and return equipment
The movement of the material and the returning device from the cultivation shall be planned in the same way as the inbound route. The service space, temporary storage and further handling are part of the local operating order. The customer asks that these appear not only in the text of a document but also on the layout. Make it clear to the team which route and location belongs to the task concerned. The required separation and treatment shall be determined by the appropriate professional. The purpose of the drawing is not a general hygiene guarantee, but a consistent presentation of actual operating movements.
Relationship between the working path and the working area
The arrival of the worker, the use of tools and the movement between different zones may be different according to the cultivation programme. Therefore, the entry and service points should also be included in the design. The maintenance access required for the system equipment is a separate situation which must be agreed with the working stock. The customer will also show the way of daily teamwork and casual professional. The consistent marking and training will help to keep the planned order in place. It is not appropriate to designate the space after that, from the free space between the equipment already installed, because an important relationship may remain unresolved.
Change the file to try the layout
During the cycle change, the output material, new stock and service tool can move simultaneously. This condition should be considered separately in preparation. The boundaries of the operating and transiting zone should be understandable to the local team. The documentation shall include the actual route and task, and the operating order shall follow the technical requirements of the chosen technology. A new meeting point may be created for later enlargement, and a re-evaluation of the old layout may be necessary. The investor thus takes over a non-ready hygiene promise, but also a coordinated spatial order and a follow-up history.
Questions to reconcile the project
- Which input and output streams meet at the site?
- Where is technology control, treatment and temporary placement?
- What special route is required for the employee, return device and maintenance?
Professional background
The related international system solutions are provided by these primary manufacturers and execution sites. The decision aspects of the project shall be interpreted independently by the article; the specific size and content of the undertaking shall be clarified on the basis of the investment data.
development project preparation
The structure, engineering and on-site installation of the greenhouse is a coordinated working process. Learn the service area and compare the tasks of the planned investment.