The physical readiness and operation of two transfer issues

The location of the building and the operation of the technology systems are a separate control point in the transfer of the greenhouse. The receipt of the key or a list of devices does not in itself show the usability of the entire plant. The investor should already specify in preparation which test and confirmation is part of the structure, engineering, water supply and automation. M Van der Hoeven Project process and HortiQ documented quality assessment approach is a professional background to these issues. However, the content of the transfer is determined by the actual contract, plans and equipment. The task undertaken and the remaining tasks shall be separated in the alert.

The test should always refer to the task described

The check you call a success will show you the state and system boundaries you've been looking at. The special operation of a device does not necessarily justify its relationship with the other system. The customer shall request a test basis which shall also specify the point, condition and result checked. The test method shall be determined by the appropriate professional for the specific task. The technical take-over does not replace the evaluation of the subsequent production result. The limit between the two is also understood by the operator. Thus, the test does not appear as a general promise of quality, but as evidence of which relationship and status has been verified in the system implemented.

The point of transfer between several branches

If the structure, technology and utility link belong to a separate actor, the control responsibility for the interconnection shall also be recorded. A common list may show to the customer which party transfers the data or ready state to the next. The relationship test of automation, engineering and water systems is particularly important. The presentation of the device and the complete operation of the device are different. The documentation shall contain the real built-in version. Open questions should not be covered by a general description: be responsible, next step and verifiable closure condition for each remaining point.

Management knowledge is part of the transfer

The local team must be aware of the identification of zones, measuring points and equipment. The presentation should not be just a list of screen functions. In a typical situation, the operator should see what data and boundaries he can intervene with. The route of alarm, confirmation and professional support shall be available. The difference between manual and automatic operation shall be shown in the own system. The documentation may be used if the markings at the site identify the same elements. The investor can link the content of the training to the content also mentioned, not just the existence of a transferred treatment book.

After closure, follow-up history is required

The receiving document shall retain the status of the test, the initial settings and the tasks still agreed. In the subsequent change, it is possible to determine what is different from the transferred version. If an examination is seasonal or subject to additional conditions, this shall be clearly stated. Local data and a known operational programme are required to evaluate the later results of the own plant. The handover is therefore not a spectacular event, but a follow-up process. It is important for the customer to understand the state, use and remaining tasks of the system that has been implemented in the same way by the project participants and local operators.

Questions to reconcile the project

  • What system boundary and state of operation are the individual handover tests?
  • Who can justify the joint operation between different branches?
  • What open task, responsible and closure conditions will remain after taking over?

Professional background

The related international system solutions are provided by these primary manufacturers and execution sites. The decision aspects of the project shall be interpreted independently by the article; the specific size and content of the undertaking shall be clarified on the basis of the investment data.

Alabama Szer Kft.

development project preparation

The structure, engineering and on-site installation of the greenhouse is a coordinated working process. Learn the service area and compare the tasks of the planned investment.