On-site pipework installation

On-site pipe installation and welding

On-site assembly, welding and connection of industrial, heating and process pipework, coordinated with workshop preparation.

Installing pipe sections, supports and connections on site

We install and weld pipework for medium and large industrial and greenhouse mechanical projects. We assemble new pipe sections, connect them to existing networks and install the associated supports, brackets, fittings and equipment connections.

Before installation, we agree the pipe material, dimensions, conveyed fluid, jointing method and checks required by the plans. We assess the work area, installation access and handling arrangements for pipe lengths and prefabricated components. At an operating facility, we agree the relevant system shutdown and connection schedule with the customer.

We adapt workshop-prepared pipe sections and steel components to the site conditions. During installation, we fit and align the pipes, position the supports and make the welded or flanged connections specified in the plans. We coordinate the positions of associated equipment and fittings with the pipe system.

For buried pre-insulated pipework, we coordinate welding, joint inspection and reinstatement of insulation and the outer casing with the pipe-laying sequence. We leave joints accessible until the required inspections are complete. For above-ground or plant room pipework, the assembly also takes account of access to supports, penetrations and fittings.

We inspect and document completed sections within the agreed technical scope. Pressure testing and the conditions for connecting the pipework to the system are agreed according to the plans, operating environment and responsibilities of the other trades. Workshop fabrication, on-site installation and preparation for handover form one coordinated construction process.

Workshop welding in Alabama workwear
Welded distribution manifold with flanged connections

Installation process

How we install and weld pipework on site

We assemble the prepared pipe sections to suit site access and the system they connect to.

  1. Technical preparation

    We agree the pipe material, jointing method, plans, access and conditions for working on site.

  2. Positioning and fixing

    We position the pipes, supports and brackets, then assemble the section ready for welding or flanged jointing.

  3. Joints and fittings

    We make the connections specified in the plans, install fittings and valves, then complete the associated insulation work.

  4. Connection and inspection

    We carry out the agreed checks, document the work and prepare the completed pipe section for connection to the system.

Discuss your on-site pipe installation project.

Tell us the site location, pipe material and dimensions, planned route and available technical documentation.