Installing pipe sections, supports and connections on site
We install and weld pipework for medium and large industrial and greenhouse mechanical projects. We assemble new pipe sections, connect them to existing networks and install the associated supports, brackets, fittings and equipment connections.
Before installation, we agree the pipe material, dimensions, conveyed fluid, jointing method and checks required by the plans. We assess the work area, installation access and handling arrangements for pipe lengths and prefabricated components. At an operating facility, we agree the relevant system shutdown and connection schedule with the customer.
We adapt workshop-prepared pipe sections and steel components to the site conditions. During installation, we fit and align the pipes, position the supports and make the welded or flanged connections specified in the plans. We coordinate the positions of associated equipment and fittings with the pipe system.
For buried pre-insulated pipework, we coordinate welding, joint inspection and reinstatement of insulation and the outer casing with the pipe-laying sequence. We leave joints accessible until the required inspections are complete. For above-ground or plant room pipework, the assembly also takes account of access to supports, penetrations and fittings.
We inspect and document completed sections within the agreed technical scope. Pressure testing and the conditions for connecting the pipework to the system are agreed according to the plans, operating environment and responsibilities of the other trades. Workshop fabrication, on-site installation and preparation for handover form one coordinated construction process.