Alabama Szer Kft. logo Alabama Szer Kft.Industrial contracting and metal fabrication

Mechanical system connections

Tank and plant room pipe connections

Pipework connecting tanks, buffer tanks, heating plant rooms, pumps and heat exchangers to the associated heating or process system.

Coordinated connections between tanks, plant rooms and pipework

We install pipe connections for tanks, buffer tanks, heating plant rooms and mechanical equipment on medium and large industrial and horticultural projects. Flow and return pipes, pumps, heat exchangers, valve assemblies and connecting pipe sections are installed as parts of the complete system.

Before installation, we agree the connection points using the system schematic, tank nozzle details and equipment data. We record pipe sizes, jointing methods, equipment positions and the limits of our scope. For modifications to an existing system, we also agree the connection date and any shutdown in advance.

We prepare pipe sections, distribution manifolds and supports in the workshop where they can be prefabricated. On site, we align the connecting pipes, make welded or flanged joints, and install the isolation valves and other fittings specified in the plans. Equipment and pipework are arranged so the system remains easy to inspect.

Installation takes account of access to dismantle flanges, replace pumps and fittings, fit insulation and reach inspection points. We assess confined or difficult plant room access during preparation so that space for the required fittings is allowed for before the final connections are made.

Pipe connections are followed by the inspections, pressure tests and documentation specified in the project scope. We coordinate with the other trades to prepare the completed assembly for system commissioning and handover. Connections between the tank, heat source, plant room equipment and pipe network are treated as one coordinated task.

Insulated plant room pipework with a pump assembly
Workshop-assembled distribution manifold and pump assembly

Installation process

How we connect tanks and plant room equipment

We coordinate workshop preparation and site installation using the system schematic and equipment connection details.

  1. Agree the connections

    We review tank nozzles, equipment data, the system schematic and connection points on the existing system.

  2. Workshop preparation

    We prepare prefabricated pipe sections, distribution manifolds and supports in the order required on site.

  3. On-site connection

    We align the pipes, make the joints and install fittings while retaining access.

  4. Inspection and handover

    After the agreed checks and documentation, we prepare the assembly for commissioning as part of the connected system.

Discuss your tank or plant room connections.

Send the system schematic, tank and equipment data, site location and intended connection points.

Request a quote

Hungarian version: Read the original

Request an industrial services quote Széchenyi 2020 – Magyarország Kormánya – Európai Unió, Európai Regionális Fejlesztési Alap – Befektetés a jövőbe