Process pipework from route preparation to system connection
We install process pipework and industrial pipe networks for medium and large projects. We install thermal water and process water pipes, heating and cooling circuits, and pipe sections connecting tanks, heating plant rooms and process equipment. Our work covers new systems as well as extensions and modifications to existing plants.
At the start, we establish the conveyed fluid, operating conditions, connected equipment and technical documentation requirements. Pipe material, diameter, fittings, valves, insulation and jointing method are selected to suit this information. We agree the scope using the plans and site survey.
When setting out the route, we take account of access, pipe support positions, penetrations, space for insulation and future maintenance. At an operating plant, we agree the work area, connection points and any shutdown with the customer in advance so that installation fits around site operations.
We prepare pipe sections, supports and brackets in the workshop in the order required for site installation. On site, we align and fix the pipes, make the welded or flanged joints specified in the plans, and install isolation valves, connections and measuring points. For pre-insulated pipework, we also coordinate the associated earthworks and joint insulation with pipe laying.
We prepare the completed pipe network for handover with the inspections, pressure testing where required, and documentation included in the agreed scope. The aim is an orderly, maintainable installation with isolation valves, flanges and inspection points that remain accessible during operation.