Draw different paths of water
When discussing water management, every water that comes out of Greenhouse becomes a single question. In fact, precipitation to the roof, surface water in the surrounding area and water from the operating system can provide a separate route and task. The preparation shall first state their origin and the further route they wish to travel. So the technical team can investigate the right relationships.
On a simple crime scene, another mark may show collection, storage and discharge. It's not a water-treatment plan, but it helps us identify the missing connection. Where's the water from the roof tunnel? What happens to the free zone? How does the technology collection separate? The value of the drawing is that the participants in the discussion talk about the same route and the same type of water.
Utilisation of the roof water by several steps
The rain collection will not end when the roof tunnel is formed. The conditions of storage, handling and subsequent use should also be clarified. The quantity collected does not in itself demonstrate that water is available for the purpose of production. When connecting systems, the role of the necessary water quality and operating speed shall be examined by the relevant experts, in accordance with local conditions.
The investor may ask about the location, access and connection of the storage unit with the irrigation system. The time pattern of collection and the need for use may not coincide. It follows that the need to examine storage and additional water sources. The specific capacity should not be taken over from a general article but should be determined from data relating to the objectives, area and water supply conditions of the own plant.
The construction status may create a different situation
The water arrangement of the greenhouse works under conditions other than construction phase and finished operation. Field planning, temporary roads and uncompleted connections may give you a temporary task. This should be considered separately by the construction organisation. The final plan alone does not show how water is treated at a time when the final relationship is not yet available.
Before opening the work area, it is worth discussion which action changes the way of water and who will ensure that the transition status is followed. An area transferred to another branch shall remain usable for the assigned work. The pre-nominated task may prevent water treatment from being discussed only when the work is already involved. The detailed solution is always part of the site plan and the relevant branches.
Make the maintenance task visible
The collection and delivery elements may require access during inspection and cleaning. Therefore, the design assessment should not only include the starting status. Who can see the change in operation? How can the element concerned be approached? Which document shows the connections? These questions provide information that can be used for subsequent operations before the details are finally put in place.
The good result of the water settlement agreement is a follow-up contact list for each water route, for tasks and for those responsible. If the greenhouse is enlarged or a new technology system is introduced, this overview shall be reviewed. The right approach does not regard all water as the same problem, but addresses the issues according to origin, use and on-site contact before the necessary professional decision.
Questions to reconcile the project
- Where did you come from and where did the first water go?
- What further steps do you need to use rainwater?
- Who manages the temporary water treatment status of construction?
Professional background
The related international system solutions are provided by these primary manufacturers and execution sites. The decision aspects of the project shall be interpreted independently by the article; the specific size and content of the undertaking shall be clarified on the basis of the investment data.
development project preparation
The structure, engineering and on-site installation of the greenhouse is a coordinated working process. Learn the service area and compare the tasks of the planned investment.