There are several steps between the roof and irrigation
The water collected on the roof and irrigation water to the plant in the Greenhouse rainwater collection is not the same system state. Collection, transmission, storage, control and use shall be given a separate task. In preparation, you should show your way on a single draft. M Dalsem water solutions and WUR His circular gardening approach supports this relationship thinking. However, specific water quality and usability should be examined in the own project. The investor should not assume that all quantities from the roof can be used automatically and unchanged for the chosen cultivation.
The collection surface shall be accompanied by a time balance
The assessment of possible collection should include a different timetable for weather and irrigation. The arrival of the precipitation is not adapted to the immediate use of the plant. The designer therefore examines the expected collection, storage and other care together. The customer must ask for an explanation of the time period and the local data to be compared. A preliminary possibility from a roof area is not a continuous supply of water. The decision should be made to show the situation in which rainwater supports the plant and when other sources or different operating conditions are needed.
Network and storage connection construction task
The drainage of the roof system, the connections and the locality trail should be included together. The network path shall not be unresolved by the traffic of the machinery or by the later enlargement area. The location, access and operational connections of the storage facility require special consultation. The limits of the different branches should be fixed together with the transfer points. In the order of mounting, when the connections still available can be checked. If the roof and water technology belong to a separate supplier, the customer should also be clearly identified before the start of the work.
The handling of too much water is also a system issue
The collection plan shall also provide an answer to the condition where the possibility of storage or use is limited. The route of overflow and discharge shall be clarified in a manner appropriate to the site. This cannot be made solely dependent on the instantaneous operation of the irrigation system. In addition to access and control, the operator also knows where the storage condition is visible and which indication indicates a different function. The competent experts are required to coordinate local water drainage and use conditions. The general idea of collecting rainwater can thus become a particularly manageable site solution.
The result is shown by the own water balance
During operation, the quantities collected, stored and actually used may be followed separately. The deviation of the three data can help you understand where the limit or event to be checked is. If the system is extended, the new collector and consumer data should also be included in the balance sheet. When assessing use, changes in water quality should also be recorded if they affect cultivation. The investment decision is not based on the acceptance of a producer percentage, but on the responsibility of the local system. The appropriate measurement and logging arrangements allow for a clear assessment of the effects of subsequent modifications.
Questions to reconcile the project
- What local rainfall and use periods is the water balance examining?
- Who is responsible for connecting the roof, storage and water treatment?
- Where is water if storage or use is temporarily restricted?
Professional background
The related international system solutions are provided by these primary manufacturers and execution sites. The decision aspects of the project shall be interpreted independently by the article; the specific size and content of the undertaking shall be clarified on the basis of the investment data.
development project preparation
The structure, engineering and on-site installation of the greenhouse is a coordinated working process. Learn the service area and compare the tasks of the planned investment.