Dropping is not a single general dose
greenhouse the design of drip irrigation shall be adapted to the cultivation method and crop. The growing medium, the layout of the lines and the production cycle affect the task of water administration. The selection of the system should therefore not start with the designation of a tube or drip. The investor must first record the stock, the environment and the operation. The dose and frequency are specific growing settings, which should be determined with appropriate professional background. The setting up of another garden cannot be considered an automatic solution operating under the same conditions.
At the end of the water system, a state of interpretation is required.
In addition to the data from the machine-house dosing, it is also necessary to examine the state of the production zones. Pipework systems, the construction of zones and the connection of equipment will play a different role. The plan shall identify which branch belongs to which stock and how the actual operation can be verified. M FAO the production guide and Hoogendoorn its integrated control system provides a professional background for linking plant and regulation. The technical and cultivation data of the own system shall still be verified separately. The customer must ask for a clear drawing from the food to the point of use, not just a list of parts.
Maintenance is part of daily operation
Control, cleaning and replacement of irrigation elements require access. Therefore, the connections and control points in the internal technological arrangement should not be unidentifiable. The maintenance task shall be designed according to the manufacturer's specifications and local water status. If a zone operates differently, the operator shall know what control it may carry out and who to include in the further test. In addition to the change in the crop, the state of the system may be changed. The unusual operation should therefore not be immediately covered by a new setting until it has been clarified that it is a technical deviation or a real need for cultivation.
Different files may request a separate zone
Where plant stocks of different developmental status or other medium are operating in the growing house, the distribution of the water system shall be assessed accordingly. Common care does not necessarily mean that each line is given the same operation. The name used by the regulatory zone, the physical pipe and the operator shall be harmonised. The traceability of changes is supported by the log and drawing together. Before a new stock is introduced, it can be clarified which settings are changed and whether the existing design is really a gift to separate operation. The necessary answer may be provided jointly by the cultivation and technical expert.
The test also shows the setting conditions
When activated, identification of zones and verification of each operating condition is a separate task. The operator shall understand the data shown by the display and the indication indicating different functions. The test does not replace subsequent monitoring of the plant stock, but may demonstrate the functioning of the technological relationship undertaken. It is worth recording the options at hand and the eligibility of the subsequent amendment. The fine-tuning of cultivation remains a verifiable process. The value of the dripping system is that it can be used and maintained for its own cultivation task, not that as many automatic options as possible are listed in the offer.
Questions to reconcile the project
- What medium, stock and production cycle are the systems for?
- How can the actual operation of each zone be verified?
- Who can change the settings and how do you keep the history of the change?
Professional background
The related international system solutions are provided by these primary manufacturers and execution sites. The decision aspects of the project shall be interpreted independently by the article; the specific size and content of the undertaking shall be clarified on the basis of the investment data.
development project preparation
The structure, engineering and on-site installation of the greenhouse is a coordinated working process. Learn the service area and compare the tasks of the planned investment.