Before new technology we know the existing state
In the modernisation of old greenhouse, the investment decision is based on the actual state of the existing structure, utility and control. The name of a new device does not automatically justify its integration into the old building. The customer must request a survey and interpretation of the previous documentation. M KUBO Modular greenhouse and Van der Hoeven water-electric integration is a professional background for relationships. However, the suitability of the own establishment is demonstrated by specific data and by the examination of appropriate experts. Before selection, the status is known which is assumed and where further checks are required to order the new system.
Structure and added task
The new technology may create a burden, a fixation or a different location. The suitability of the structure shall be tested with these data. The previous plan and the building that has been implemented may differ and therefore the role of the survey is particularly important. The customer must ask the supplier of the new equipment for the necessary information for the design assessment. The location shall be shown in addition to the working crop and maintenance access. The apparent space device may not be installed without a change. The decision is therefore based on the relationship and condition, not on the general industrial character or the former usability of the old building.
Compatibility of public utility and automation
The supply capacity and control link shall be aligned with the specific new equipment. Close connection or existing program does not automatically prove an appropriate fit. The operating description shall show the data transmitted by the device, the signal it receives and how its actual condition is visible. If the system affects more than one supplier, the responsibility for integration shall be stated. In addition to the new equipment, the customer should also see the necessary intermediate task. An abandoned entry or programme item may later be a separate job and the comparison should therefore be at the same commitment limit.
Working order in operation
At the rate of modernisation, the limits of existing production should also be addressed. The plan shows which zone and system works at the time of the procedure, where it is necessary to stop and when the new connection can be tried. The access route and temporary work site are part of the site. The customer and the producer shall determine the conditions for conversion together with the technical team. The old and new state should be marked differently and traceable. A replacement of equipment should not be an unnoticed change of operation affecting the whole system. Documentation of status change and feedback will help the local team use daily and receive the new system.
Updated version to be returned
The test and documentation shall relate to the changed relationship. The customer requests that the actual built-in version and new settings be retained. The operator should identify which system has changed and where to find the new guide. The previous history may be retained to reflect the change in the subsequent operational comparison. The own results can be tested from local measurements and from the known production programme. Modernisation is therefore not a general saving promise, but the achievement of the specified operational task. Knowledge of the existing state and the new system test together provide a verifiable basis for the decision.
Questions to reconcile the project
- What is the existing structural, supply and control status confirmed in the survey?
- What new load or data link does the device create?
- How can the transition be organised with the working production and management system?
Professional background
The related international system solutions are provided by these primary manufacturers and execution sites. The decision aspects of the project shall be interpreted independently by the article; the specific size and content of the undertaking shall be clarified on the basis of the investment data.
development project preparation
The structure, engineering and on-site installation of the greenhouse is a coordinated working process. Learn the service area and compare the tasks of the planned investment.