Enlargement is not just a new structural area

When expanding the working greenhouse, the new building part and the relationship of the old plant are the essential part of the decision. The utility, automation, handling and handling may also vary. The customer in the enlargement programme should specify the new stock and operating order. The UMass a site design approach and Van der Hoeven integrated project process with professional background to questions. However, specific usability is shown by a joint assessment of the existing state and the new programme. The pre-prepared expansion site does not automatically represent certified capacity in all associated systems.

Separate central and separate tasks

The enlargement plan should show which function remains common and which requires a separate zone or equipment. The central water and heat supply load, control and measurement points connection are separate arrangements. The investor shall request the demonstration of simultaneous operation and partial shutdown. The old and new stock can also receive different programs, so the system boundary that appears to be common under the same name can be misleading. In addition to the physical relationship, the documentation and programme marking will be changed. The customer therefore sees not only an area built into it, but also a system of operation that matches its own production calendar.

The construction work area and the working path together

The approach to the new work area can meet the routes of the working site. The place of transport, installation and temporary storage shall be designated with daily movement of products and workers. The customer, together with the technological and construction team, should identify the different user situations. At this rate, the control and maintenance access of the old systems should also be maintained. Relationship work and necessary shutdown shall be agreed in advance. The handling of enlargement is therefore not entirely dependent on the rate of construction. It also depends on the connection between the site operation and the construction order how the work can be done in order for the stock and the local team to be understood.

Gradual transfer and status marking

If the new part is made at several speeds, the physical preparedness and the operating test shall be specified separately. The customer should see which zone is connected to the plant when and under what conditions. The test between old and new equipment shall be identifiable. The operator should not only receive a new menu point on the screen but also understand the status and limitations of the system. The documentation shall show following each version provided. An open task should not be covered by a generic description. Gravity may be used if the limit of commitment of each stroke and the associated operational status are clear for the participants.

Do not disappear from the test history

After the expansion of the site, energy, water and working data may show a different system boundary. The comparison should therefore include the date of the new area, stock and start. The raw aggregate of the former and expanded plant is not necessarily comparable. Keep the history of the change. This is how the customer can make a later decision from the experience of operation. The value of enlargement is shown by the service of the own programme and the relationship achieved. The structural potential, the public utility capacity and the operating result remain three separate issues, to be assessed with the data specified.

Questions to reconcile the project

  • Which function remains common and which new zone works separately?
  • What kind of relationship work or shutdown affects the old plant?
  • Is the system boundary and condition of each transfer schedule clearly identifiable?

Professional background

The related international system solutions are provided by these primary manufacturers and execution sites. The decision aspects of the project shall be interpreted independently by the article; the specific size and content of the undertaking shall be clarified on the basis of the investment data.

Alabama Szer Kft.

development project preparation

The structure, engineering and on-site installation of the greenhouse is a coordinated working process. Learn the service area and compare the tasks of the planned investment.