Project implemented
Hévíz shopping centre
The Hévízi EcoFamily in business, we did mechanical engineering, running around the hall, and improved designated errors.
- Site
- Hévíz
- Work completed
- Mechanical construction, branding and repair
The Hévízi EcoFamily in business building services engineering construction, rounding of the building and repair of designated errors Alabama Szer Kft. Our work has been linked to internal technical fittings and partial outside hall work. The front facade, the front roof, the portals, the corners and the side wall closures gave different working areas of a commercial building.
Mechanical and external construction work for a business
The Hévízi EcoFamily in the development of business, Alabama Szer Kft. Building services engineering work, running around the hall and improving designated errors. The mandate was linked to internal and external tasks. Mechanical construction was designed for the professional design necessary for the use of the business, and the work related to the hall concerned the edges and connections of the building. We have completed all the work undertaken.
The investment is well separated from the internal installation environment and the external facade work area. The two tasks included other access, other material and other work order. Their common goal was to match the usable interior and finished exterior design of the commercial building. Mechanics and borders thus gave their own execution task to the same business.
Front facade and the appearance of business
The long front facade of the building is divided by glazed portals, wooden surfaces and a bright upper bar. The forward over the portal line gives special emphasis to the front side. For a commercial building, this facade is part of the environment directly used by visitors: arrival, entry and traffic in front of the building are linked to the same site.
For long facade lines, the uniform appearance is given together by large hull surfaces and smaller closing elements. The direction of a border, the design of the corner or the connection to the portal is a short section, yet it becomes visible in the order of the entire facade. We had to fit our own external work into these meetings. The environment of the front, upper bar and entrances has given a coherent task.
In addition to the bright and wooden facade parts, the dark frames of the glass surfaces provide definite lines. The closures had to be located in this image. On a front facade, the tiny fractures are visible at close range, so the relationship between the straight and the corners is of special importance. Boundaries make the building look connected to the boundaries of the hull fields.
Place of construction of building services engineering
The mechanical installation in the shop was part of the technical background for the operation of the interior. Building services engineering in a commercial building is worth understanding with the use of: employees, customers and equipment for daily operation use the same environment. The location of the mechanical systems is therefore also linked to the interior of the building.
During the assembly period, the work sites that are later surrounded by the equipment of the shop and daily use are still directly accessible. The installation of the internal networks is provided together with the building structure, connecting surfaces and accessible mounting sites. Our work in Hévíz took place in this actual construction environment. The engineering task was carried out in connection with the inner space of the business.
Internal installation in the work area under the ceiling
The interior installation environment of the Hévíz shop was characterised by the construction of work sites near high-altitude space and upper support. The interior supports of the building, the upper surface surfaces and the scissor lifts used for the work are also displayed on the own recordings. Between the floor level and the task near the ceiling, a connection of height was also established.
In such a work area, the installation of equipment and the approach to the installation point are linked. It shall remain a suitable place for lifting while the work must be carried out alongside the support structure and the interior surfaces which are being made. On-the-spot construction therefore requires spatial coordination. In Heviz, the internal specialist tasks were linked to the construction of the building in this installation area.
The height of the installation also takes place below the work area. There is a continuous connection between the way the device is moved and the working point to be reached. Therefore, in the condition of interior installation, materials on the floor, support structure and upper part cannot be treated independently. The use of the available area is part of the on-site construction as well as the direct installation.
The edges of the hall cover and the role of closures
In addition to the large wall and roof surfaces, the building of connections is part of the finished building in the hall. On top of the facade, at the edge of the foreroof, at the corners and adjacent to the openings, there are different surfaces. Disk edges are the elements adapted to these transitions: they seal and clamp the edges of the hull surfaces.
The closure has both a visual and technical role. The well-formed edge leads the meeting of the surfaces and participates in the external protection of the connection. The detail used shall always be adapted to the relevant wall or roof design. In the Hévíz task, the circular border of the building consisted of such interconnected connection work. The individual sections were prepared in connection with the local coverings and the construction.
Longitudinally bordering by the front
The foreroof passing through the front facade was a key part of the external work. Here is the Eresalji surface, the facade bar and the design above the portals located close to each other. The border had to follow the long straight sections, then connect to the details of the building at the locks and changes of direction. The work sites followed the entire section of the front.
On a long facade, the matching of each element can be interpreted together with the adjacent sections. The field task therefore goes beyond the location of a single separate plate: the continuing line, the meeting surface and the place of closure shall be treated together. At the Hévíz foyer, this environment defined its own work, above the portal line and along the outer edges.
Eresalji surfaces and upper line of facade
The bottom-visible design of the front roof and the upper line of the facade are seen in a different view, but it is a common part of the building. The closure of Eresalj is directly in mind when using the front page. The upper bar gives a longitudinal line of the facade from a distance. For the connections of the two surfaces, our work had to be adapted to the existing proportions and surface order of the building.
In addition to the straight sections, the end points are also significant when meeting the upper and lower planes. On the side of a foreroof, the closure turns in a different direction, and on the part that reconnects to the facade it meets another surface. These nodes follow each other on the building. In Heviz, these local solutions were part of a larger, interconnected external workpiece in the circular border.
Corners, side walls and vertical connections
On the corners of the building, the facade surfaces change direction. In addition to the horizontal edge, vertical closure may also appear and the side wall will be divided with additional work points. On the Heviz building, the wooden cover, the bright upper bar and the darker footage environment meet as different surfaces. The edge had to be made according to this division.
The corner and straight wall are different mounting positions. Two facade directions are connected at the corner, and on the sidewall, the meeting of the roof edge and the wall field should be followed. Our outside work has therefore given us a task on several sides of the building. The aim was to ensure that the closure of the designated sections was compatible with the relevant surface and that they were also connected to the circular construction of the building.
Closes and selected repairs near ports
On the front side, the dark-framed glass portals and the facade surfaces next to them provide separate connections. The closure related to the vertical portal edge is made in a different position than the longitudinal edge of the foreroof. The work shall be carried out directly in the vicinity of the relevant arrow-dryer and adjacent hull. The repair tasks assigned to such points were also carried out in Heviz.
Local improvement shall be based on the actual state of the part concerned. The position of the coupling surfaces and the section to be closed shall determine where and in what extent it is necessary to intervene. In our own department, we have made the correction of the errors and the preparation of the connections involved. These tasks were linked to the round-round border along portals and facade transitions.
For the selected repairs, already developed parts of the building provide the environment for intervention. The adjacent portal frame, the hull field and the existing closure define the fit together. The work therefore requires local attention: a change of connection is linked to the remaining surfaces. The settlement of the part to be repaired had to be done in this existing architectural order.
Preparation and on-site installation of plate edges
The shape of the flattened sheet and the place of incorporation are inseparable in the riveting work. The question of the direction in which the surfaces to be closed meet, where the line is changed and what stage the element has to join is the preparation. The vertical closure of a corner, a leak and a portal is therefore a different form of task.
Workshop preparation and on-site fitting are two parts of such execution. The curved element is placed in the actual building, where it must be adapted to adjacent coverings and to the continuing edge. The varied connections of the Hévíz building make a good sense of its importance. The straight sections and the local closures had to be made as a related work in the respective facade.
During handling the prepared profile, the state of the visible surface is also considered. On the finished facade, the closure is not in itself, but in conjunction with the adjacent hull. Local installation and installation therefore affect both the form of the element and the meeting of the surfaces. This will be seen especially near entrances, where the details of the facade appear directly next to the users.
Coordination of internal and external work
Mechanical construction and external border were linked to different parts of the same building. The internal tasks were carried out in the business, outside work on the facade and in the vicinity of the foreroof. The different access points and the use of assets had therefore to be treated together in the field work organisation. The two areas gave their own expertise to prepare the commercial building.
The value of such participation shall appear in the matching working sections. Internal engineering is a service for use, external closures are part of the building's connection. The Alabama Szer Kft. Both areas were present in his assignment to Hévíz. During the construction we focused on the assigned internal and external tasks, adapted to their actual installation environment.
Prepared engineering, framing and repair work
The Hévízi EcoFamily we have completed the engineering work undertaken, the running-around hall border and the improvement of the selected connections. Work from the interior installation area to the front facade, from the front roof to the closing of the corners and side wall. These workplaces together constitute the own implementation content of the Hévíz reference.
The project belongs to our mechanical work in commercial buildings and to the related hall covering fittings. The large surfaces and smaller connections met within a building, so the completion of the part-tasks is also important in the overall picture of the finished business. In Hévíz he performed this mechanical, riveting and local repair task Alabama Szer Kft.
Photos of the EcoFamily project in Hévíz









Alabama Szer Kft.