Project implemented
Gyöngyi Kertészet - The mechanical engineering of 11 200 m ² greenhouse and 800 m ² server section in Csanytelek
A Csanytelek We have completed the mechanical execution of 11 200 m ² greenhouse and 800 m ² server parts of Gyöngyi gardening.
- Year completed
- 2025
- Site
- Csanytelek
- Work completed
- Greenhouse mechanical installation
A Csanytelek In Gyöngyi, we have completed the mechanical work of 11 200 m² greenhouse and the corresponding 800 m² server section. The undertaking linked underground preinsulated lines, engine-operated pressurised pumps, the connection of the Greenhouse heat centre, the internal plant heating and soil heating. The section of work implemented in 2024-2025 is 2025.closed on 29 April.
11 200 m ² greenhouse and 800 m ² server section
A Csanytelek The investment of pearl gardening was linked to a new green house 800 m² server area with 11 200 m². Together, the two buildings represented 12 000 m² investment scale. The Alabama Szer Kft. involved in the implementation of the contract work of the Greenhouse and the server part. Our own task was to combine several directly related parts of the garden heat supply.
The mechanical engineering of the new growing space shall not be separated from the network that delivers the heat. Therefore, the investment has been part of the external pre-insulated pipes, the engine pump, the Greenhouse heat centre and the internal heating network. This is accompanied by the design of soil heating. The construction is worth showing through the relationship of these workplaces: from external heat supply to heating pipes in the production area.
Our own engineering undertaking
The Alabama Szer Kft. The Gyöngyi Kertészet He was working on a new greenhouse engineering project. Our work covered the underground installation of pre-insulated pipelines, related machinery and pumping tasks, the installation of internal heating in the plant house and the construction of soil heating. The work package included land work for soil heating. The engineering division we took was fully completed.
This role has linked several stages of construction. The pipe sections of the heat supply had to be fitted to the same greenhouse, whose internal heating lines were also installed. The relationship between the engine room and the Greenhouse heat centre is thus not a separate detail. A Csanytelek reference shows the related mechanical task: how the pipework systems outside the greenhouse have been connected to the heating and the soil heating system in the production area.
Preparation in Csanytelek work area
The preparation of the construction on-site included the reception, storage and organisation of access to equipment for pipes. A Csanytelek steel tubes, stored tube materials and a wider environment of the horticultural plant are visible on work frames. These images preserve the early state of mechanical work: the period during which materials are prepared for subsequent installation. The series of photos therefore allows access to the preparation phase of the investment.
For a greenhouse heating installation of this size, the site layout of the materials directly affects the next working phase. For long pipe fibres to be moved, appropriate space is required and storage must be adapted to accessibility and assembly order. The overview of the work area gives a good sense of this location. Mechanical construction begins before the first tube is made: by arranging the materials, working areas and mounting tasks available.
Preinsulated lines for heat supply
One of the essential parts of the undertaking was the underground installation of Isoplus pre-insulated pipes and drill. Pipework systems connected units of heat supply from the buffer tank to the pre-pressuriser pump located in the production area and to the heat centre of the greenhouse. The contract also named the installation of a pre-insulated tube section at the next stage. In addition to the direct greenhouse connection, network work was also adapted to the network line system.
The task of the pre-insulated pipeline in this context is to transport heat between mechanical points located apart. The wire is a connecting element of the heat supply and therefore the connection between the end points and the integrated sections should be managed together. A Csanytelek At work, this continuity between external pipe assembly and internal engineering was one of the key aspects. The heating of the growing space is a system that can be interpreted with the connection.
Machinery and pre-presses
The machinery shed was connected to the pressure pumps and the related pipes. The pumps are the power units for moving water in the heat supply; the connection is made with the wiring and connections between different points of the system. Csanytelek The engine room was an important node between the pre-insulated lines and the section leading to the greenhouse.
The environment of each device and the arrangement of the pipes leading to it are counted together for machine-house installation. The space requirements for fittings, connecting wires and access are met in the same space. The Alabama Szer Kft. has also carried out this related task within its own mechanical work package. The engine room is therefore managed as part of the entire heat supply chain: a unit related to the operating conditions of the greenhouse heating network.
Connecting the Greenhouse heat centre
The next link between external and internal engineering was provided by the Greenhouse heat centre. The order specifically named the tube section from the pre-pressure pump to the heat centre. The importance of this is that the heat supply route after the pipeline continues in the Greenhouse machine system. The piping between each point determines how the heat supplied reaches the internal distribution.
During the construction, the fitting of piping sections and host mechanical units was a joint task. The heat centre environment is also connected to the heating network of the production space, so the work done here can be interpreted together with the green house interior. A Csanytelek This complexity has given us the essence of our own work: the pipework systems connection of mechanical units in different locations and the coordination of the heating fittings.
Indoor heating equipment
The interior heating of the 11 200 m ² greenhouse was one of the largest production areas. The contract included both the pipes and pumps of the plant heating. The internal tube assembly was adapted to the structure of the growing space and to the heat supply interfaces. In addition to building a pipeline outside the greenhouse, the task included installation work at the heat site.
In the large-scale plant, the heating network means an extensive pipe system. Pipe lines, sections and supply units shall be connected in a common system. The construction work therefore requires the joint construction of the longitudinal sections and connections. Csanytelek the external heat supply and internal heating were part of the same mechanical work package; the result of the construction was the interconnection of these units.
Land heating and related land work
Another independent task of greenhouse engineering was to develop soil heating. This is a heating solution linked to the lower level of the growing space, which was in addition to the internal heating of the plant Csanytelek At work. The undertaking also included related land work. Pipework systems installation and ground preparation have therefore been directly associated with each other as on-site tasks.
The location of the soil heating is also important for the subsequent use of the growing space. The network is created in a place to which access can be made under other conditions after further development of the greenhouse. Therefore, the order of the related works and the location of the piping sections should be managed together with the rest of the investment. A Csanytelek In the project, Alabama Szer Kft. the ground heating has been carried out as an own undertaking related to the internal heating installation.
Pipes, pumps and surface treatment
In addition to the pre-insulated pipes and drilling, technical works of the contract also named the engine-house pre-pressuriser pumps, the internal heating pipes and pumps of the greenhouse and the plant paint. This list shows the material and installation complexity of the task. Each item is integrated in a different location, yet it has a related role in the system.
The design of the pipework systems, the installation of machinery units and the completion work related to them are a common result. In the plant environment, the appearance of pipes and fittings is also part of the transparency of work, while surface treatment is linked to the protection of built-in steel elements. The project is presented as part of the greenhouse heating installation, from the preparation of the materials to the site design.
Relationship between greenhouse and server
A Csanytelek investment 800 m ² server part of the new greenhouse belonging to the building part. The closure of own mechanical work recorded the construction of the greenhouse and the service part together. Both areas are therefore included in the presentation of the investment steps: in addition to the 11 200 m ² growing space, the corresponding 800 m ² service section is part of the project.
For a gardening development, the connection between the production space and service functions also occurs in the building services engineering fittings. Mechanics must link several points of investment, while different tasks may be linked to different spaces. A Csanytelek work within our own contract task has brought together these mechanical connections. The reference thus shows, in addition to the heating of the new greenhouse, our role in the construction of the corresponding server building.
On-the-spot welding of pipes and contact of workplaces
A Csanytelek In the schedule of orders, end wall work, welding of internal heating pipes and installation of ground heating were presented as separate workspaces. These tasks were linked to different on-site conditions. The end wall fittings were connected to the boundaries of the growing space, the long heating pipes were connected to the inner space of the greenhouse, and the ground heating was connected to the soil network. Mechanical work thus affected several areas of the building.
For the construction of welded heating pipewater systems, the preparation of pipe materials and the on-site assembly are included. The straight sections are connected to a common system by connections, sections and mechanical units. A Csanytelek the internal heating pipes and pumps were combined and the installation task was therefore determined by the fitting of these elements. The cultivation site has won its role along with the supply from the heat centre.
The full implementation of the greenhouse heating installation in this project meant the implementation of the defined mechanical work package. The external wire, pump units, end wall connections and internal pipework systems were used to heat the same greenhouse. This connection provided a common professional framework for field tasks.
Period and closure of implementation
The mechanical works were associated with the contract agreed in 2024. Surviving photographs of the site preparation show the autumn of 2024, while our work package was completed on 29 April 2025. The project was therefore among the larger greenhouse mechanical installations of the 2024–2025 period. The installation tasks and the completed work package are the main reference points when presenting the project.
The performance certificate recorded the quality of the technical work of the greenhouse and the service part under contract. The Alabama Szer Kft. The result of its work was therefore the achievement of the thermal, tube and internal heating tasks undertaken by the Greenhouse. A Csanytelek The reference of pearl horticulture illustrates the implementation practice in which the external preinsulated pipeline, engine room, heat centre, plant heating and soil heating are prepared as a coherent technical work.