Alabama Szer Kft. logo Alabama Szer Kft.Greenhouse construction and industrial contracting
The Majsai Kertészet wide inside view of the heating line

Project implemented

Majsai Kertészet - 7280 m ² greenhouse mechanical construction in Orosháza (2025-2026)

At the Orosháza site of Majsai Kertészet, we completed the full mechanical installation for the 7280 m² greenhouse area covered by the 2025–2026 order, together with installation of the associated pre-insulated pipe.

Year completed
2026
Site
Orosháza
Work completed
Greenhouse construction

Technical data

Covered Greenhouse Area
7280 m²

The Majsai Kertészet 7280 m² greenhouse area has fully completed the mechanical installation of the building Alabama Szer Kft. We worked according to the agreed engineering plans; it was also part of the installation of the associated pre-insulated pipe. The 2025-2026 work has linked several areas of installation of the greenhouse heating network.

Orosházi greenhouse, used for horticulture

The Majsai Kertészet In his project in Budapest he worked on the engineering system of a 7280 m² greenhouse Alabama Szer Kft. The mandate included mechanical installation within the greenhouse and installation of the pre-insulated line related to the project. The work was done on the basis of agreed engineering plans. For the 2025-2026 installation, various parts of the heating pipewater systems were connected.

The engineering of a garden greenhouse serves directly the conditions of cultivation. The heat must reach the right place, while the space which can be used for crop production, transport and subsequent fittings must remain. The size of the work was therefore provided together by the entire Greenhouse area and the interconnected mounting points. Our task was to implement this engineering network as planned on site.

Greenhouse heating is responsible for the heat supply of the cultivation environment in changing external conditions. The sun, the outside temperature and the growing needs both influence when and where heat is needed. Therefore, engineering should be approached together with the use of greenhouse and its use. In the oroszáz investment, our finished construction work was the connection between the design planned and the actual pipework systems.

The Majsai Kertészet wide inside view of the heating line
Installation of heating lines in the Oroshouse Majsai Kertészet Greenhouse.

From mechanical engineering plans to on-site tube assembly

The technical basis for the construction was the agreed engineering documentation. During the design assembly, the location, direction and connections of the wires had to be aligned with the actual design of the greenhouse. Longitudes of pipes, higher-leading sections, side-wall joints and connections of equipment are part of a common system. These were carried out as matching mounting tasks at the site.

The Alabama Szer Kft. its role in this investment was to complete the engineering work undertaken by the Greenhouse. M Majsai Kertészet we have coordinated the tasks of mechanical engineering and on-site tube assembly. The reference shows the result of this particular work in the Oroshouse: pipes, mechanical units and their installation environment related to the functioning of the garden.

Heat transport in the gardening system

The greenhouse heating consists of several tasks built together. The heat shall be transferred to the place of use, divided between the necessary wires and transferred to the production area. The design of the pipework systems should therefore follow the operation of the whole system. The distance running wire and the greenhouse have different functions, but it is connected to the same heat supply target.

In the Oroshouse mandate, the installation of a pre-insulated tube for internal mechanical installation was also associated. This relationship makes work particularly visible: the investment also gave a project task from the external track and from the internal greenhouse system. When meeting each section, it is not only a tube end that counts. The continued track, mounting connections and the actual location of the equipment shall determine on-site work together.

Preinsulated wire on the related track

The installation of the pre-insulated tube for the project was part of the task undertaken. The underground line sections on the construction footage can be seen in an open working pit and in pre-reloading condition. The two lines, the direction changes and the binding points can be followed together. This assembly phase will then remain largely below the orderly surface.

The construction of the pre-insulated tube is to attach thermal insulation and outer cover to the tube carrying the medium. The insulation is used to reduce heat loss, and the cloak is intended for external protection. In the case of on-site connections, the continuity of the line and the design of the insulated system shall be managed together. The Oroshouse reference shows this gardening pipework system in the actual installation environment, coupled with the interior heating installation for an investment.

At the underground track, the spatial position of the pipeline is also important: the straight sections, the direction changes and the links to the building are the sequels of each other. These parts can be seen together in the open state of the workpit. The wire assembly was a task of construction adapted to the work area next to the Greenhouse and to the points of connection, which also shows the meeting of the work under ground level and internal engineering work.

Changes in direction of pre-insulated pipes in an open trench
Installing underground pre-insulated pipes before backfilling.

Spinal pipes next to the Greenhouse structure

In the inner space of the greenhouse, the larger lines of the heating network, together with the support structure and the transport system, shape the installation possibilities. High-level vertebral sections, vertical take-offs and longitudinal pipes are included in their own recordings. The lifting machines used for fitting helped to reach the workpieces. The location of the wires was to be established in addition to the existing building structure allocation.

The connection between the spinal lines and the branches attached to them gives one of the foundations of the internal network. For the reenhouse pipe assembly, long repetitive building construction fields create a very noticeable order, but the connections and connecting units remain separate installation tasks. M Majsai Kertészet This work was carried out as part of the engineering design of the project, according to the conditions on the ground.

Heating lines in the growing space

The wide internal view shows the long order of the growing space and the location of the heating pipes in several rows. The pipes are repeated in the large area of the greenhouse, between the columns and the internal structural fields. The network is therefore not displayed at a single mechanical point: it has been a complete installation task for the whole growing space.

The position of the pipes is also important because of the later use of the greenhouse. In addition to heating elements, the necessary workspace and transport connections must remain. In this scale of gardening, both repetitive wiring sections and local connections need attention. In Orosháza, this internal network was one of the most spectacular parts of the task in the field of mechanical engineering based on agreed plans.

Connections, locks and local connections

The local connections between the long wiring sections complete the mechanical design. The images along the side wall also show heating lines, connections, locks and hose connections. These details show how the larger network meets each local installation point. In addition to continuing pipelines, the installation of available fittings is part of the construction.

Isolation valves allow the relevant pipe section to be isolated. The connections are therefore also important for later maintenance: access to the valve must remain available, and the pipe joints must suit the actual on-site arrangement. In our work at Majsai Kertészet, these smaller connection tasks served the same greenhouse heating system as the larger mains and rows of heating pipes.

Heat exchanger and pump engineering connections

On one of the project's overviews of engineering, plate heat exchanger, circulator pump, pipework systems and connecting wires appear. Several elements of the heating system are added together in the vicinity of the equipment. On-the-spot installation here means connecting pipelines, coordinating links to equipment and the space available. A more dense mechanical node is formed compared to the larger greenhouse space.

The general function of the heat exchanger is to transfer the heat of one flow medium to the other, with separate flow spaces. The pump is involved in circulating the liquid. The role of equipment and the design of pipework systems are therefore closely linked. The image shows the actual installation environment of these units; the project presentation highlights on-site construction and their location in the system.

The accessibility of equipment and fittings in the machinery unit environment is particularly important. Pipework systems not only connect to the device: it also occupies a seat around it and determines the possibilities for future access. The relative position of pipelines, hand-operated fittings and machinery units in the project images will therefore also help to understand the system.

Greenhouse heat exchanger with a pump and pipework fittings
On-site installation of a plate heat exchanger and associated pump assemblies.

Workshop preparation and site assembly

The Majsai Kertészet The work-related recordings include the preparation of a pipe unit at a workshop. The tube section, floral connections and welding working phase are shown in the image. Workshop preparation and on-site installation take place in different environments, but meet in the engineering network. The pipe unit shall be fitted to the corresponding wires and fittings at the actual installation site.

This relationship is an important part of greenhouse construction. In addition to the large internal pipework systems, smaller units are also created that will combine more connections. The preparation, movement and installation of these works are of a different nature than the installation of long line lines. The Alabama Szer Kft. The workshop work phase and the installation environment within the greenhouse are both displayed in its home reference as part of the same engineering task.

Floor heating installation in service corridor

The engineering within the greenhouse has also provided installation work in service areas. The floor heating pipes related to the design of the corridor are laid on the pre-concrete film. The pipes are present in the building, as part of the field of work. This working phase shows the installation before the later finished surface is finished, when the established tracks are still available.

The service corridor is a place for daily work in the production area. The mechanical elements placed here shall be treated together with the design of the socket and the running machine. The situation of the heating pipes is no longer visible directly after the concrete loading and this stage of construction is therefore of special importance. The project also maintained the preparation of the corridor and the environment for subsequent on-site pipe connections.

Laying underfloor heating pipes in the service passage
Installing underfloor heating circuits before concreting.

Local construction in large greenhouse space

The 7280 m ² greenhouse has provided several different mounting positions. The lanes between the longitudinal lines, take-offs near the side wall, and in the vicinity of the mechanical units there are more frequent points of connection. For access to higher line sections and installation near the terrain, there is another work position. On-site tube assembly had to be carried out in accordance with these circumstances.

Therefore, the construction of the wires and the usability of the working area are counted together in engineering. The devices, the prepared materials and the finished tube sections moving during installation are present in the same greenhouse space. The work phase's own recordings show this real construction environment. In the project presented, Alabama Szer Kft. was responsible for the execution of the engineering equipment, according to agreed plans and the Orosház location.

Prepared working part of mechanical engineering as a related system

The Majsai Kertészet In its oroszháza project we completed the mechanical installation of 7280 m ² greenhouse and the installation of the associated pre-insulated wire. The work carried out in 2025-2026 linked the internal heating network and related installation tasks to a joint horticultural investment. The technical basis was agreed engineering plans.

The importance of the finished workpiece is given by the connection of the components of the system. The heat supply line, the spine sections, heating lines and mechanical connections are used together to heat the greenhouse. The Alabama Szer Kft. for this reference, it summarises on-the-spot construction in horticultural engineering, pre-insulated pipework systems work and experience gained in various installation environments.

Automatically translated from Hungarian. Read the original