
Project implemented
TisVet - Complete assembly of 10 forage silos in Chickpeas
We completed the on-site assembly of ten feed silos, each with a storage capacity of 14 tonnes, in Csólyospálos for TisVet Kft.
- Year completed
- 2025
- Site
- Csólyospálos
- Work completed
- On-site assembly of feed silos
We have assembled on-site ten forage silos with a storage capacity of 14 tonnes each on-site at the winch. TisVet To order Kft.. The Alabama Szer Kft. the construction of the silo structures, which are constructed from elements, by contract, on the basis of the technical documentation provided. The part of the work that was completed in 2025 was linked to a livestock investment. M TisVet We assembled a total of 20 silos at two locations: 10 on both Chestnut and Tázlár.
Ten forage silos at a settlement in Chestospar
The storage of feed is an important part of the day-to-day operation of livestock holdings. It is for silos to provide adequate storage space for separate, closed storage of feed. In this order, we have been assigned the task of assembling ten units of the same nominal capacity in Chickpeas.
The contract specified a storage capacity of 14 tonnes for each silo assigned to the facility. Assembly of the ten units was a separate, clearly defined installation task. The project photos taken on site show the silo components and intermediate stages of assembly.
The Alabama Szer Kft. Installation
Our work focused on the structural assembly of forage silos that could be assembled from the elements. The construction was determined by the architectural and technical design documentation provided for the contract. The silos were thus built up from elements of a predefined system, which we had to compile on-site.
In such modular silo assembly, each element is delivered separately to the work area and the storage structure is formed by the assembly of these elements. The installation task consists of related operations: the review of the components, the assembly of the structural units and the construction of the connections are designed to create the finished structure.
Storage device from elements
The value of the execution sequence is precisely that it makes the work part possible to follow. In the initial stage, separate silos can be seen, and the form of storage units is becoming more and more visible during the compilation process. In addition to the large structural parts, the layout of the work area can also detect the scale of the task.
In the order comprising ten units, the repeated structural design was particularly important. The same assembly task had to be carried out for several silos, following the available documentation. The photographs may therefore show similar components and assembly stages; these are parts of the actual work at the site.
Prepared working part under contract
The silo assembly of the Chickpeas was completed in 2025. As a result of the work carried out, the ten forage silos assigned to the site were drawn up under contract. The silo structures composed of separate elements have reported the result of the work part undertaken.
The Alabama Szer Kft. the silo assembly is fully completed. This project is one of our work related to the installation of twisted steel structures and silos on the ground. The gallery shows the implementation by recording on the work area of the Csõpósboros, from the construction of the structural elements to the later stages of installation.
Alabama Szer Kft.














