Project implemented

Thermal-water pipeline replacement in Forráskút: 1008 metres

In Forráskút, we replaced 1008 linear metres of outdated above-ground thermal-water pipeline.

Year completed
2020
Site
Forráskút
Work completed
Pipework systems

Technical data

Pipeline length
1008 m

Overview

The Alabama Szer Kft. The Trivega Kft. for 1008 running meters replaced thermal pipeline in Forráskút.

The construction covered the exchange of existing above-ground outdated wiring sections.

Purpose of the investment

A Forráskút modernising the obsolete overground pipe section of the thermal network.

The agreed scope of work

  • Replacement of 1008 m of existing above-ground thermal-water pipeline.

Result

The 1008-metre-long thermal pipeline exchange has been completed.