Project implemented
Thermal-water pipeline replacement in Forráskút: 2004 metres
in Forráskút 2004, we have carried out a full exchange of river-meter thermal pipeline, Trivega Kft. in the working part. The modernisation was made with a preinsulated steel pipe, predominantly on underground tracks.
- Year completed
- 2021
- Site
- Forráskút
- Work completed
- Replacement of pre-insulated thermal conductors
in Forráskút 2004 river meters have been fully replaced by an outdated thermal pipeline, Trivega Kft. in the working part of your order. A new connection to the former surface tube with preinsulated steel pipe, which led to concrete guardians, was mainly made on underground tracks. The investment was intended to modernise the heat transmission connection between the thermal well and the horticultural site; the 2004-metre workpiece was completed in October 2021.
Modernisation of nearly two kilometres of thermal line
The Trivega Kft. in Forráskút its investment was aimed at the exchange of a 2004 river-meter thermal pipeline. The Alabama Szer Kft. has participated in the implementation of existing pipework systems, which will replace the outdated wire. The 2021th work was linked to the connection of heat transport between the thermal well and the site, so the scale of the task was determined by the connection between the long track and the two end points.
The thermal pipeline is a background-active yet decisive element of the horticultural heat supply. The distance between the well or machinery and the place of use is bridged. The condition of the pipework systems is therefore part of the operational conditions of the related plant. Forráskút the investment was an upgrading of an old system: the replacement of a pipeline which had already given the operator a continuous task by its previous design and condition.
Status of previous surface line
According to the technical specifications for the preparation of the modernisation, the existing pipeline was built in the 1970s. He was on top track, relying on concrete guardians, with outer insulation and aluminum covering. Over the decades, the pipeline has been corrosioned in several places, and the insulation and hull conditions have deteriorated. The description of the history also identifies malfunctions and loss of production.
Therefore, the task of replacing a long heat supply line goes beyond correcting a local pipe failure. The whole section concerned and its connections shall be assessed together. A Forráskút Accordingly, the order covered the modernisation of the designated section of 2004 metres. The aim was to replace the worn-out pipework systems with a new line for further use of the thermal water connection.
New pre-insulated tube, predominantly underground
An important difference between the old and the new system is the installation of the wire. The former pipe was running over the ground in concrete guardians. The technical preparation of the new pipeline, on the other hand, was largely counted on underground laying. The preinsulated steel tube KPE He was surrounded by an outer cloak. In addition to the material and construction of the pipeline, the modernisation therefore also affected the physical appearance of the trail.
Underground piping sections and access points remaining above the surface shall be treated as a common network. The relationship between the two endpoints is given together by straight sections, direction changes and connections to the receiving system. A Forráskút The pre-insulated pipe and the associated section were part of the same pipework system task in preparation for work.
Technical scale of the line
The detailed technical tender specified pre-insulated pipe with a nominal diameter of DN200 and an outer casing size of 315 mm. The preparation included 12-metre pipe sections and the fittings needed along the route. These design data show that the investment concerned a long, larger-diameter thermal pipeline at the site. The defining quantity in the completed work package is the 2004-metre pipeline length.
The length and cross section answer a different question. The 2004 meter shows the extent of the pipework systems section implemented and the nominal diameter indicates the size of the pipe chosen in the technical preparation. The machining, bandages and connections match this track. In such a task, the uniform handling of tube material and the coordination of on-site pipe assembly are essential conditions for the long pipeline to eventually form a coherent system.
Track and on-site environment
The line Forráskút it connected the region of the thermal well and the site by touching several areas. On-the-spot conditions were different to the designated trail: agricultural areas, existing pipe sections and transport links. The detailed technical preparation specifically addressed the obstacles on the track and the availability of the installation area. The pipework systems therefore had to be adapted to the real characteristics and surrounding features.
For a long track, the task appears in several successive areas of work. The conditions for tube transport, material placement and installation access may vary from section to section. However, the position of the points of accession determines the whole of the pipeline. A Forráskút The replacement of the thermal line is therefore presented as a single related pipework systems work, some of which are adapted to the local environment.
Track corresponding to existing utilities
The link between the track and the existing utilities was also published in the on-site discussions. The correspondence in the summer of 2021 called for a gas pipeline crossing at one stage of the relevant thermal pipeline. This is an on-the-spot feature that should be treated with the trail when organising pipework systems work. The area surrounding the gardening plant was an environment with existing systems, and it was not freely built.
Knowledge of public utility relationships and taking into account the potential of the working area are part of the same preparatory task. On each section of the long line, other conditions may specify access, handling or mounting. These conditions should be assessed in the context of the entire pipeline route, as a single local connection or crossing may affect the development of the surrounding sections.
A Forráskút The reference also illustrates this industrial installation task that fits the existing environment. The modernisation focused on the replacement of the designated thermal pipeline, while adapting to the conditions of the region and region. The new pipework systems had to be integrated into existing systems within the limits of their own workpiece.
Preparation of pipes and tubes
In the construction preparation of the pre-insulated pipeline, there were also the construction of the piping materials and the materials related to the direction changes. Pipework systems had to be compiled from straight sections and from the elements following the change in the trail. Workshop preparation, purchase of materials and transport to the site are also published in the detailed offer as directly related tasks to on-site installation.
The importance of preparation for a wire close to two kilometres is particularly noticeable. The volume of the tube material, the movement of long strands and the mounting sites along the track determine the organisation of the work together. Each material shall assist in the execution if available at the appropriate stage for the next installation task. Therefore, pipe assembly and handling are linked on-site tasks on this investment scale.
Development of welded steel tube network
A Forráskút technical preparation of the pipeline was built on the use of preinsulated steel tubes. The essential work of converting steel tube sections into networks is to set up on-site pipe assembly and the welding connections. The connection between straight wire, rolling and connecting sections is counted together. Each bond is part of the entire heat supply trail, so the pipework system is connected between the sections.
The Alabama Szer Kft. has completed the working part of the contract pipework systems in full. The reference shows the replacement of the pre-insulated thermal line and the corresponding tube assembly. During the construction of the long line, adjustment to the track, assembly of the piping elements and connection to the end points were part of the same task.
Link to existing system
The modernisation took place in an existing heat supply environment. The new wire had to be connected to the previously built system, while it triggered the designated obsolete phase. The technical preparation also called for steel tube connection tasks related to existing plastic reconnections. This shows that the construction has also affected the development of links between the old and the new system, in addition to the long straight pipe sections.
Network connections shall always be interpreted in conjunction with the receiving system. Their own sections of a new pipeline only perform their role if the connection between the two ends is established. A Forráskút the whole of the trail and the local interfaces were therefore part of the same modernisation task in the investment. The presentation highlights this connection: the new pipeline that fits the existing heating system.
Local work organisation for long wire
The preparation of the investment was based on both human and machine resources needed for the installation on site. The contract included a team of professionals, loading and handling machines, vehicles and generators suitable for the transport of pipes. The list shows the nature of the work: long pipes had to be delivered to the site, moved along the track and then adapted to the mounting sites.
The issue of on-the-spot power supply has been specifically recorded in preparation because no network power source was available in the designated work area. Therefore, the conditions for pipe assembly had to be ensured in sections further from the network. This circumstance clearly shows that the replacement of the thermal pipeline was an industrial construction task adapted to several on-site installations outside the workshop. The construction area, material supply and installation work required joint organisation.
Heat insulation and secure wiring design
The description of the old pipework systems also included the use of external insulation and cover under the circumstances justifying the exchange. The new wire with preinsulated steel pipes and KPE The technical preparation of the coating is therefore based on a uniform treatment of material and external design. At the pre-insulated pipe, the internal steel tube, thermal insulation and the cloak are part of the same tube.
In compiling the trace line, the connections between the piping elements are also linked to materials for the continuity of the insulation system. The detailed offer also took into account the elements needed to seal the bonds. In the presentation of pipework systems, this makes the connection between heat transport and wiring. The modernisation of the thermal line was the joint task of the tube body, connections and external protective layer.
Renewal of the relationship between the horticultural heat supply
The replacement of the thermal pipeline was an investment in the horticultural heat supply of Trivega. The connection between the thermal well and the site is part of the background system for the use of heat. Due to the corrosion of the old wire and the associated failures, the renewal of the designated section was also considered to be an important task for operation. The new pipework systems were designed to modernise this existing relationship.
The value of such work is the renewal of a basic infrastructure element linked to a larger system of operations. The heat transmission line is a physical link between the production site and the use, which often moves further from gardening buildings. A Forráskút The investment therefore also shows the role of the existing network systems, which are located next to the visible greenhouse equipment: a built-in line system for the provision of heat supply is required.
Completion of the 2004-metre work section in 2021
A Forráskút The contractual working part of pipeline modernisation was implemented in 2021. The completion of the performance is related to 29 October 2021. The volume achieved was 2004 river-meter thermal pipeline. The Alabama Szer Kft. for this reference, it represents work related to the construction of long-track pre-insulated pipelines, to the connection to existing systems and to the industrial assembly on-site.
The full implementation of the own undertaking was the implementation of the defined pipewater systems work package. In the investment, the replacement of the obsolete surface wire, the use of the preinsulated steel tube and the predominantly underground trail combined gave new design to the thermal water connection. A Forráskút The Trivegan project is thus a work of upgrading horticultural heat supply, resulting in the renewal of a nearly two kilometres-long interconnected line section.
Images of the implementation of the thermal line