Alabama Szer Kft. logo Alabama Szer Kft.Industrial contracting and metal fabrication

Mechanical fabrication

Heating centre and plant room fabrication

Prefabrication and on-site installation of greenhouse heating centres and plant room units, including pipe connections and preparation for commissioning.

From workshop fabrication to on-site system connections

We fabricate greenhouse heating centres and plant room units for medium and large horticultural projects. Distribution manifolds, pipe sections, supports and valve assemblies are prepared and combined into prefabricated units sized for transport. On site, the units are connected to the heat source, buffer tank, mains and greenhouse heating circuits.

The heating centre distributes heat to the individual heating circuits. The system arrangement depends on the greenhouse heating zones, required temperature levels, equipment and operating needs. Pump, heat exchanger, isolation valve and control valve positions are agreed together with the pipe routes and access needed for maintenance.

Preparation includes reviewing the system schematic, equipment list, connection sizes and available plant room space. We establish the positions of flow and return lines, tank connections, heating manifolds, drains, air vents and measuring points. For extensions to existing systems, connection options and the available shutdown period also affect the fabrication and installation sequence.

In the workshop, we fabricate the distribution manifolds and pipework sections suitable for prefabrication. We cut pipes to size, assemble the sections, form the branch connections, make welded and flanged joints, and produce the required supports. Fabrication follows the actual connection dimensions of the pumps, heat exchangers and fittings to be installed.

Transportable unit sizes are selected to suit loading, site access, lifting arrangements and plant room openings. On site, we position the units, make the interconnecting pipe joints and connect the external mains. Supports and fittings are arranged to allow operation, inspection and later component replacement.

Depending on the project scope, the mechanical assembly may also include thermal insulation, cladding and measuring or control connections. We coordinate sensor, control valve and pump interfaces with the electrical and automation trades so that mechanical fabrication and controls can be aligned before installation.

Before handover, we check pipe joints, supports, equipment connections and completion of the specified tests, then prepare the system for commissioning and balancing. For a quotation, provide the system schematic, equipment list, plant room dimensions, pipe connection data and required delivery schedule. These establish the scope of workshop fabrication, on-site installation and work by the associated trades.

Workshop-fabricated distribution manifold and pump assembly
Completed insulated plant room pipework

Implementation process

How we fabricate heating centre and plant room units

We coordinate fabrication and installation as one mechanical system, from the schematic to the on-site connections.

  1. Technical coordination

    We agree the heating circuits, equipment, connection points, installation dimensions and system arrangement.

  2. Workshop prefabrication

    We fabricate distribution manifolds, pipe sections, supports, valve assemblies and equipment connections.

  3. On-site installation

    The fabricated units are positioned and assembled in the plant room to suit the actual site conditions.

  4. Connections and handover

    We connect the heat source, buffer tank and greenhouse heating circuits and prepare the system for commissioning.

Let’s define the heating centre or plant room scope.

Send the system schematic, equipment data, required heating circuits and available installation dimensions.

Request a quote

Hungarian version: Read the original