Alabama Szer Kft. logo Alabama Szer Kft.Industrial contracting and metal fabrication

Air conditioning and cooling systems

Commercial and industrial air conditioning

We install, extend and modernise air-conditioning, VRV/VRF and associated cooling systems for commercial and industrial buildings, coordinating the work with how the building is used and its other services.

Air-conditioning installation to suit your building

We install air-conditioning systems for industrial sites, commercial buildings and service areas. We coordinate indoor and outdoor units, associated pipework and condensate drains with the building layout. We can agree a standalone air-conditioning work package or carry out the work as part of a wider building-services installation.

A completed example of combined VRV and ventilation installation is the EcoFamily store project in Mezőkövesd.

Before installation, we review the rooms, how and when they are used, expected loads and the required control zones. An office, a service room and an industrial workspace have different needs. Equipment selection and the technical scope depend on the design information, existing infrastructure and work agreed with the client.

Outdoor-unit positions, access to indoor units and pipe routes all matter for air-conditioning, VRV/VRF and associated cooling systems. We agree supports, wall and floor penetrations, space for insulation and condensate-drain routes before installation. The work can then be coordinated with the other building services.

On-site work may include fixing equipment, installing the specified pipes and connections, insulating pipework and fitting condensate drains. Electrical supplies, controls and building-management connections are coordinated with the responsible trades. The quotation records the division of work and the documentation required for handover.

Before extending or replacing an existing system, we review the equipment, pipes and connection points that will remain. Shutdowns and access to the affected areas are agreed around site operations. Connections between new and retained components are prepared using the available technical documentation and equipment requirements.

Inspection, adjustment and commissioning tasks depend on the selected system and the agreed division of work. Manufacturer-specific or specialist tasks are identified separately in the scope. Handover records the completed installation, with accessible equipment, orderly pipework and the information needed for maintenance.

Installation work on a Gree VRF outdoor unit
Outdoor VRF unit beside a commercial building

Installation process

From requirements to handover

We agree the technical scope in advance, from the system requirements and equipment positions to the checks and documentation needed for handover.

  1. Requirements and system scope

    We review the intended use, rooms, plans and existing building-services connections.

  2. Equipment positions and pipe routes

    We coordinate indoor and outdoor units, pipe routes, supports and condensate drainage.

  3. Equipment and pipework installation

    We complete the agreed mechanical installation and provide the connections required for the related trades.

  4. Checks and handover

    We agree inspection, adjustment, commissioning and handover documentation according to the system requirements.

Discuss your air-conditioning project

Tell us how the building is used, which rooms are involved, what system is already installed and when you need the work completed.

Request an air-conditioning quote

Hungarian version: Read the original

Request an industrial services quote Széchenyi 2020 – Magyarország Kormánya – Európai Unió, Európai Regionális Fejlesztési Alap – Befektetés a jövőbe