Recycling is only the beginning of the cycle

The design of rerotation of drains does not stop from the water being used at a collection point. The conditions for further treatment, control and reuse should also be laid down. The investor should first record which production system the water is returning from and what condition he expects at the next use point. M WUR The European Parliament and the Council have adopted a proposal for a regulation on the protection of the euro against counterfeiting. Dalsem water solutions support the whole material flow approach. On the site of the plant, spring water and the operational programme determine the specific task. The existence of a collection tube alone does not justify the use of recirculated water.

The re-use should have a control gate

The technological description shall show where and under what conditions water is returned to use. The results of the treatment, the state of the water and the related growing requirement shall be evaluated with appropriate professional background. Mixing water of different origins does not necessarily simplify the decision. The customer must ask for a clear outline from the collector to the additional system points and name the operator. If any of the conditions are different from the design, there should be a specific way of checking. The operator therefore sees not only that the pump is working, but can also follow the conditions of use.

Identification of zones and routes

If several growing zones are connected to the collection, the system should be marked so that the incoming flows and their respective stocks can be identified. The physical branch, geographical name and control marking shall be identical. A change of stock or extension of zone may change the interpretation of recurring water. The amendment should therefore be recorded in the documentation and in the settings. The development of a separate route that can be managed is not the same in all projects, but the decision situation should be specified in advance. The investor can see the flexibility of the chosen system in subsequent operations.

You need to have a manageable connection during maintenance.

The shutdown of part of the recycling system may also affect the operation of other elements. The maintenance plan should therefore specify what happens with collection and use at the time of the intervention concerned. The control points and control points shall also be accessible at the working site. The accessibility of a container, filter or measuring element shall not remain an ex post problem. In addition to the normal operation, the plan shall include a meaningful stop condition. The task is not necessarily to order new equipment: in many cases it is necessary to clarify the order to be followed during the system boundary and intervention.

The rate of rotation is calculated from local measurement

For the evaluation of the result, the quantity entered, returned and reused may be measured or followed separately. The ratio reported without system boundaries and production period does not indicate full operation. If one of the data is estimated, this shall also be indicated in the assessment. It is appropriate to link your own measurement to cultivation and treatment events so that the differences can be interpreted later. The use of the investment is thus examined on its own. Receiving the results of manufacturers of other systems does not replace the local balance sheet, water quality control and specific use decision.

Questions to reconcile the project

  • After which check and at which point can the reused water be used?
  • How do the water flows of the various cultivation zones remain identifiable?
  • From which measurement limit can you calculate your own recycling result?

Professional background

The related international system solutions are provided by these primary manufacturers and execution sites. The decision aspects of the project shall be interpreted independently by the article; the specific size and content of the undertaking shall be clarified on the basis of the investment data.

Alabama Szer Kft.

development project preparation

The structure, engineering and on-site installation of the greenhouse is a coordinated working process. Learn the service area and compare the tasks of the planned investment.