Heat transport for greenhouses

Pre-insulated pipework

We install buried pre-insulated heating pipework from the buffer tank or heating centre to the greenhouse, including the related earthworks.

From the tank to the greenhouse in one coordinated installation

We install pre-insulated pipelines for medium and large greenhouse, horticultural and industrial heating projects. Buried heating mains connect the heat source, buffer tank and heating centre to the greenhouse mechanical systems. The agreed scope can cover route preparation, trenching, pipe laying, welded joints, joint insulation, backfilling and system connections.

A pre-insulated heating pipe consists of a carrier pipe for the conveyed medium, surrounded by thermal insulation and an outer protective casing. Steel carrier pipe systems commonly use PUR foam insulation and an HDPE casing. Pipe sizes, insulation, single or twin pipe arrangements and fittings must be selected to suit the operating temperature, pressure, heat load and route.

Depending on the project requirements and the customer’s specification, an ISOPLUS pre-insulated pipe system or a DHP – District Heating Pipes – system may be considered. The choice depends on the designer’s specification, available pipes and fittings, jointing technology, monitoring system and delivery schedule. Components and installation procedures must be agreed for the selected pipe system; compatibility between products from different manufacturers is assessed individually.

Before work begins, we review the tank, heating centre and greenhouse connection points, site levels, existing utilities and access to the work area. The route must accommodate straight pipes, elbows, branches, reducers, building entries and the measures required for thermal expansion. Trench dimensions and bedding follow the design, ground conditions and the manufacturer’s laying instructions.

Pipe delivery and handling are planned around the installation sequence. We agree unloading areas, temporary storage and material handling along the route. The outer casing and pipe ends must be protected against damage and contamination during storage, lifting and placement in the trench. This is especially important for long pipe lengths and large-diameter pre-insulated mains.

After the carrier pipe joint has been made, the insulation and outer casing must be reinstated at the connection. Joint insulation uses the sleeve, casing seal and insulation material specified for the selected system. Weld inspection, joint preparation and sealing must follow the correct sequence so that the completed joint is protected against moisture ingress.

Where required, the pipe system can incorporate leak detection wires and suitable monitoring equipment. The wires help monitor the condition of the insulation and detect moisture ingress; automatic monitoring also requires the appropriate equipment. Measuring circuits, connections, inspection points and evaluation equipment are agreed to suit the selected system and the operator’s requirements.

Before the pipework is covered, we carry out the specified checks and pressure tests and connect the pipeline to the rest of the heating system. Bedding, backfill and compaction follow the required arrangement to protect the pipe, and the affected work area is reinstated. For a quotation, provide the route length, pipe sizes, operating data, fittings and connection points, earthworks scope and any specified pipe system.

Moving pre-insulated pipework on site
Fitting the outer casing around a pre-insulated pipe joint

Implementation process

How we install pre-insulated pipework

We coordinate the earthworks and pipe installation from setting out to backfilling.

  1. Route and setting out

    We agree the connections between the tank, heating centre and greenhouse, then set out the pipeline route and levels.

  2. Trenching and bedding

    We excavate the trench, prepare the bedding and provide space for fittings, changes of direction and connections.

  3. Pipe laying and joint insulation

    We position the pre-insulated pipes, make the joints and reinstate continuous insulation and moisture protection.

  4. Connections and reinstatement

    We connect the pipeline, complete the required checks, then backfill, compact and reinstate the route.

Let’s agree the route for your pre-insulated pipework.

Send the tank, heating centre and greenhouse locations, the proposed route and the main heating system data.