Instead of name, record result

The key section greenhouse is an attractive simple name, but it does not determine the result required in the contract itself. The finished building, the working technology system and the plant prepared for cultivation do not mean the same in all offers. The first question to be clarified is therefore the status of the customer and the task left with him or other contracting parties.

Structure may be a separate, well-defined mandate if the responsibility for preparation and coupling systems is known. The whole project may require a different organisation. There is not a single correct contractual form for every situation. The choice will be provided by the investor to see his own coordination capacity, the branches involved and the decisions required between them, not just the name of the package.

Prepare a liability table per task

The earth work, foundation, frame, cover, climate, water and electricity systems should appear in separate rows. Each line may be subject to planning, transport, installation and inspection. So it turns out that a device is being transported by one side, but its connection is being made by another. The misunderstandings typically occur at these meeting points, so the names of the contacts are as important as the list of components.

The table is also worth extending to the results of the work. Who can confirm that the foundation connection can receive the frame? Who controls the electrical conditions of the technology? Who will accept the results of the trial? These are project-dependent questions. Clean responsibility does not mean forcing all tasks into a single organisation, but it does show who initiates and decides when several participants meet.

There may be more than one level of transfer

After physical preparation, monitoring, installation and information to operators may also be necessary. The greenhouse construction contract must name the level to which the undertaking extends. The mode of transfer may be used if it is connected to the assigned functions. The examination of a working ventilation unit will demonstrate a different result than the subsequent operational evaluation of the entire cultivation strategy.

The production result cannot be merely explained by the installation of the systems. Production decisions, operation and local features play a separate role. Therefore, it is appropriate to separate from the proven technical condition at the time of delivery and the additional tasks of the start-up. If aid or training is part of the undertaking, its content and responsibility shall not include just a general promise of assistance.

Choose a partner based on the commitment limit

The emphasis on the construction of a already designed, defined structure may be on site fitting and mounting. When creating a new site, concept and unification of branches are more important. The investor can ask for comparable offers by giving the same commitment limit or by knowingly asking for a subtask and a project variant.

At the end of the discussion, a short exclusion list is also valuable: it shows what needs to be done elsewhere. The missing task becomes visible and scheduled. If the contents of the package change later, the liability table should also be updated. The aim is an order from which participants understand the same finished status and the same steps, regardless of the marketing term.

Questions to reconcile the project

  • What does the contract mean by finished status?
  • Who's in charge of the branch connections?
  • Is training part of the commitment content?

Professional background

The related international system solutions are provided by these primary manufacturers and execution sites. The decision aspects of the project shall be interpreted independently by the article; the specific size and content of the undertaking shall be clarified on the basis of the investment data.

Alabama Szer Kft.

development project preparation

The structure, engineering and on-site installation of the greenhouse is a coordinated working process. Learn the service area and compare the tasks of the planned investment.